First Set Build

Yesterday, the stage was full of drilling sounds. Max, Jordan, Katie, Thomas, the stage managers, Brandon and Grant started building some cool structures on the stage. Before we started building, the stage was empty and looked boring. However, everyone who was there spent their precious time on the stage working, and with their efforts and the empty stage started looking fabulous and exciting.


First, under Grant’s direction, we put three walls together and one on the top and drilled them to build a cabin. Then, we added three more to build a double cabin. The double cabin was cozy and comfortable. After building the double cabin, we added one staircase to each side so people can go top of the cabin. The cabin and staircases look incredible and enormous.


Everyone helped each other with building and cleaning up. We could not build the enormous constructions quickly without working together as a group. And, we were so proud of ourselves and excited to act on the stage with the great structures. Our first set build was a great and fun time for everyone.

by Michelle Chang, '15


No comments:

Post a Comment